What Permit Timeline requires

Permits & approvals required

  • Building Permit (Combination)Required
    A combination building permit covers structural, electrical, plumbing, and mechanical work for the ADU.
    From the code
    • Application Process and Requirements Building Permit Requirement A Building Permit is required to create an ADU or JADU. There are no exemptions. Depending upon the number of dwelling units created by the ADU(s), either a Combination Building Permit or a Building Permit will SD Information Bulletin 400, p. 15
  • Ministerial ADU/JADU reviewRequired
    ADUs/JADUs that meet state standards are approved ministerially (no public hearing or discretionary findings).
    From the code
    • Code Chapter 14: General Regulations (3-2026) (11) The record owner is not required to live on the same premises of an ADU. (c) Development Regulations for JADUs. (1) On a premises with an existing or proposed single dwelling unit, one JADU is permitted, subject ... following: (A) The JADU shall be within an existing or proposed single dwelling unit or attached garage; (B) Construction of the JADU may expand the floor area of the existing single dwelling unit up to 150 square feet to only allow for ingress and egress SDMC §141.0302, p. 8
    • Diego Municipal Code Chapter 14: General Regulations (3-2026) (8) ADU Home Density Bonus Agreement. The affordable ADUs shall be guaranteed through a written agreement and a deed of trust securing the agreement, entered into by the applicant and President and Chief Executive Officer ... Diego Housing Commission, or their designee, prior to the issuance of a Building Permit for the first affordable ADU or bonus ADU, whichever occurs first, that meets the following requirements: (A) A rental affordable ADU home density bonus agreement shall utilize the following qualifying criteria SDMC §141.0302, p. 13
  • Site Development Permit (Environmentally Sensitive Lands)Conditionaltriggered by: esl, steepSlopes, sensitiveHabitat, flood
    ESL (steep slopes, sensitive habitat, wetlands, floodplain) generally requires a Site Development Permit with discretionary findings.
    Parcel intersects environmentally sensitive lands.
    SDMC §143.01 (Environmentally Sensitive Lands)
  • Historical resources reviewConditionaltriggered by: historicCultural
    Historic-district location or a primary structure 45+ years old can trigger historical-resources review before approval.
    Historic overlay and/or primary structure age ≥ 45 years.
    SDMC §143.0212 / DSD Historical Resources review

Review disciplines

No separate review discipline specific to this section.

Submittal requirements

No submittal specific to this section for this project.

Process & sequencing

  • Address assignmentRequired
    A new detached/attached unit needs an assigned (sub-)address before final inspection.
    City of San Diego — Addressing / GIS
  • SB9 lot split / two-unit (NOT evaluated)Not evaluated
    This manifest evaluates ADU/JADU paths only. SB9 urban lot splits and two-unit projects are a separate path and are not assessed here.

Reference documents

Applicable documents — Permits / Permit Timeline · 13 · click to expand

RankTopics CoveredSection Citation
1
City of San Diego Information Bulletin 400 — Accessory Dwelling Unit / Junior ADU
Permit application, Ministerial review
SD Information Bulletin 400
2
California Department of Housing and Community Development — ADU Handbook 2024
ADU overview, JADU overview, Ministerial review
CA HCD ADU Handbook 2024
3
City of San Diego Information Bulletin 100 — Estimated Due Dates for Building Permits
Review timeline
SD Information Bulletin 100
4
City of San Diego Information Bulletin 140 — Residential Addition / Remodel
Additions, Remodels, Submittal requirements
SD Information Bulletin 140
5
City of San Diego Information Bulletin 153 — Building Permit Issuance
Permit issuance
SD Information Bulletin 153
6
City of San Diego Information Bulletin 188 — Deferred Submittals
Deferred submittals
SD Information Bulletin 188
7
City of San Diego Information Bulletin 250 — How to Apply for a Change of Record
Change of record
SD Information Bulletin 250
8
City of San Diego Information Bulletin 353 — Grading & Right-of-Way Permit Issuance
Right-of-way, Site grading
SD Information Bulletin 353
9
City of San Diego Information Bulletin 500 — Substantial Conformance Review
Conformance review
SD Information Bulletin 500
10
City of San Diego Information Bulletin 513 — Preliminary Review
Preliminary review
SD Information Bulletin 513
11
City of San Diego Information Bulletin 710 — Procedures for Building Demolition / Removal
Demolition
SD Information Bulletin 710
12
Building Industry Association of San Diego — ADU Design Checklist v3
ADU overview, Permit application, Ministerial review
BIA-SD ADU Design Checklist v3
13
San Diego Municipal Code Ch.14 Art.1 Div.1 — General Rules for Separately Regulated Uses
Land Development, San Diego Municipal Code
SDMC Ch.14 Art.1 Div.1 — General Rules for Separately Regulated Uses

Reference tables (21)

SINGLE DWELLING UNITS/DUPLEX/TOWNHOME

Table Capture v1.0
ShortMediumLong
Section
Accessory structure additions (e.g., decks, stairs, fences, fireplaces, equipment anchorage on grade, equipment enclosure)Any project with a prior discretionary permitAlterations or addition >7,000 sf
Alterations/additions < 3,000 sf with no increase in densityAlteration/addition 3,000-7,000 sfNew > 7,000 sf
Foundation repair except piles/caissonsFoundation repair using piles/caissons
Retaining walls < 10 ftRetaining walls greater than 10 ft
Swimming poolShoring walls
New up to 7,000 sf

All Other Building Permits

Table Capture v1.0
ShortMediumLongComplex
Accessory structure additionsProjects with a prior discretionary permitChurch >10,000 sfHotel/motel (new) > 5 stories
Alteration/Addition to an individual dwelling unitAdditionsHotel/motel < 5 storiesMultiple Dwelling Units >100 units
Change of occupancy other than to A or H occupancy typeAntennasNon-residential TIs > 50,000 sfMulti-plex theaters/auditoriums
Commercial coachesChange of occupancy to A or HNon-residential building more than 2 stories but less than 5 storiesNon-residential building 5 stories or more
Foundation repair except piles/caissonsChurch <10,000 sfRestaurants/bars/club > 10,000 sfParking structure > 5 stories and 100,000 sf
Paint spray boothFoundation repair using piles/caissonsSchool >10,000 sfShopping malls
Parking lots onlyMDU < 20 unitsSeismic retrofit > 4 storiesMixed-use buildings > 3 stories
Retaining wall < 10 ftNon-residential building < 2 stories < 20,000 sfMultiple Dwelling Units with 20-100 units
SignsParking structure < 3 storiesNew buildings 7 or more stories above grade level
Storefront alterationRestaurant/bar/club up to 10,000 sfParking structure <5 stories and 100,000 sf
TIs/ Alterations up to 10,000 sf (except for restaurants/bars/clubs or with hazmat)Retaining wall >10 ft
School < 10,000 sf
Seismic retrofit < 4 stories
Storage racks
Shoring walls
Swimming pools
TIs/Alterations < 10,000 sf for restaurants/bars or with hazmat
TIs 10,000-50,000 sf

Short Medium Long Final Version

Table Capture v1.0
ShortMediumLongFinal Version
First ReviewRecheckFirst ReviewRecheckFirst ReviewRecheck5
86106156

Review Times

Table Capture v1.0
Short First ReviewRecheckMedium First ReviewRecheckLong First ReviewRecheckComplex* First ReviewRecheckFinal Version
1062010402060305

Review Time

Table Capture v1.0
Short First ReviewShort RecheckMedium First ReviewMedium RecheckLong First ReviewLong RecheckComplex* First ReviewComplex* RecheckFinal Version
86158301560305

Short Medium Long Complex* Final Version

Table Capture v1.0
ShortShortMediumMediumLongLongComplex*Complex*Final Version
First ReviewRecheckFirst ReviewRecheckFirst ReviewRecheckFirst ReviewRecheck5
6610620103015

Table 1 — Allowable Spans for DF #2 Roof Rafters (DF-Larch)

Table Capture v1.0

Dead Load: up to 10/20 (Shingles/Tiles) psf Total (incl. roofing); Live Load: 20 psf; L/Δ = 240; (T-R802.4.1(2))

Rafter SizeSpacingAllowable Span (Shingles / Tiles)
2X624"11'-11" / 10'-4"
2X616"14'-1" / 12'-7"
2X612"15'-6" / 14'-7"
2X824"15'-1" / 13'-0"
2X816"18'-5" / 16'-0"
2X812"20'-5" / 18'-5"
2X1024"18'-5" / 15'-11"
2X1016"22'-6" / 19'-6"
2X1012"26'-0" / 22'-6"
2X1224"21'-4" / 18'-6"
2X1216"26'-0" / 22'-7"
2X1212"26'-0" / 26'-0"

Table 2 — Allowable Spans for DF #2 Ceiling Joist (DF-Larch)

Table Capture v1.0

Dead Load: 10 psf; Live Load: 20 psf (Light Storage); L/Δ = 240; (T-R802.5.1(2))

Joist SizeSpacingAllowable Span
2X424"7'-3"
2X416"8'-11"
2X412"9'-10"
2X624"10'-8"
2X616"13'-0"
2X612"15'-0"
2X824"13'-6"
2X816"16'-6"
2X812"19'-1"
2X1024"16'-5"
2X1016"20'-2"
2X1012"23'-3"

Table 3 — Allowable Spans for DF #2 Floor Joist (DF-Larch)

Table Capture v1.0

Dead Load: 10 psf; Live Load: Floor 40 psf; L/Δ = 360; (T-R502.3.1(2))

Joist SizeSpacingAllowable Span
2X624"8'-3"
2X616"9'-9"
2X612"10'-9"
2X824"10'-5"
2X816"12'-9"
2X812"14'-2"
2X1024"12'-9"
2X1016"15'-7"
2X1012"18'-0"
2X1224"14'-9"
2X1216"18'-1"
2X1212"20'-11"

Table 4 — Allowable Spans (Braced/Unbraced) for DF #2 Roof Beams & Headers, Exterior & Interior Bearing Walls (DF-Larch)

Table Capture v1.0

Max. Dead Load: 20 psf; Max Live Load: 20 psf; (T-R 602.7(1))

Size12-ft Bldg WidthNT24-ft Bldg WidthNT36-ft Bldg WidthNT
2-2x66'-0"/4'-3"14'-7"/3'-2"13'-10"/2'-8"1
2-2x87'-7"/5'-4"15'-9"/4'-0"24'-10"/3'-4"2
2-2x109'-0"/6'-9"16'-10"/4'-9"25'-9"/4'-4"2
2-2x1210'-7"/7'-5"28'-1"/5'-8"26'-10"/4'-9"2
3-2x89'-5"/6'-7"17'-3"/5'-1"16'-1"/4'-3"2
3-2x1011'-3"/7'-10"28'-7"/6'-2"27'-3"/5'-1"2
3-2x1213'-2"/9'-3"210'-8"/7'-1"28'-6"/6'-0"2
4-2x810'-11"/7'-8"28'-4"/5'-10"27'-0"/5'-0"2
4-2x1012'-11"/9'-0"29'-11"/7'-0"28'-4"/5'-10"2
4-2x1215'-3"/10'-8"211'-8"/8'-2"29'-10"/6'-9"2

a. Building width is perpendicular to ridge measured to exterior walls.

b. NT – Number of trimmer studs required to support each end of header.

d. Allowable span of braced beam / Allowable span of unbraced beam.

Table 5 — Cantilever Spans for Floor Joists

Table Capture v1.0

Max. deck dead load 10 psf; Live load 40 psf

Size (DF-Larch #2)SpacingCantilever SpanUplift Force (lbs)
2x812"34"165
2x816"29"180
2x1012"49"201
2x1016"42"220
2x1024"34"255
2x1216"57"268
2x1224"47"330

a. Ratio of backspan to cantilever span shall be not less than 2:1.

b. A full-depth floor joist shall be provided at the cantilevered ends. Solid blocking shall be provided between joists over the support.

c. Connection angle capable of resisting the indicated uplift force shall be provided at the backspan support.

Table 6 — Rafter Heel Connection to Ceiling Joist

Table Capture v1.0

Roof Live Load 20 psf [Table R802.5.2(1)]; Minimum number of 16d common nails

Rafter SlopeTie Spacing (in)Roof Span 12 ftRoof Span 20 ftRoof Span 28 ftRoof Span 36 ft
3:1216581013
3:12247111519
4:121646810
4:1224581215
5:12163568
5:122447912

Roof span is measured between exterior walls.

Table 7 — Allowable Spans & Loads for Wood Structural Panel (Floor & Roof Sheathing)

Table Capture v1.0

Sheathing Grade STRUCT-1; continuous over two or more spans; strength axis perpendicular to supports; applies to panels 24" or wider; (T-R503.2.1.1(1))

Panel Span Rating (Roof/Floor)Min Panel Thickness (in)Roof Max Span — Edge SupportRoof Max Span — No Edge SupportRoof Total Load (psf)Roof Live Load (psf)Floor Max Span (in, T&G/blocking)
24/03/824204030
24/167/162424504016
32/1615/32, 1/23228403016
40/2019/32, 5/84032403020
48/2423/32, 3/44836453524

Table 8 — Nailing Schedule

Table Capture v1.0

(T-R602.3(1))

ConnectionFasteningRemarks
Roof
Blocking between joists or rafters to top plate3-8d (2-1/2" x 0.113")Toe nail
Ceiling joist to plate3-8d (2-1/2" x 0.113")Toe nail
Ceiling joist not attached to parallel rafter, laps over partitions4-10d (3" x 0.128")Toe nail
Collar tie rafter, face nail or 20-gage ridge strap3-10d (3" x 0.128")Face nail
Rafter to plate2-16d (3-1/2" x 0.135")Toe nail
Roof rafters to ridge, valley or hip rafters4-16d (3-1/2" x 0.135") / 3-16d (3-1/2" x 0.135")Toe nail / End nail
Wall
Built-up corner studs10d (3" x 0.128")16" o.c.
Built-up header two pieces with ½" spacer16d (3.5" x 0.162")16" o.c. along each edge
Continued header two pieces16d (3.5" x 0.162")16" o.c. along each edge
Continuous header to stud4-8d (2-1/2" x 0.113")Toe nail
Double studs16d (3.5" x 0.128")12" o.c.
Double top plates10d (3" x 0.128")12" o.c. Face nail
Double top plates, minimum 24-inch offset of end joints, face nail in lapped area8-16d (3-1/2" x 0.135")Face nail
Sole plate to joist or blocking16d (3-1/2" x 0.135")12" o.c. Face nail
Sole plate to joist or blocking at braced wall panels3-16d (3-1/2" x 0.135")12" o.c. Face nail
Stud to sole plate4-8d (2-1/2" x 0.113") or 3-16d (3-1/2" x 0.135")Toe nail
Top or sole plate to stud3-16d (3-1/2" x 0.135")End nail
Top plates, lap at corners and intersections3-10d (3" x 0.128")Face nail
Floor
Joist to sill or girder4-8d (2-1/2" x 0.113")Toe nail
Rim joist to top plate (roof application also)8d (2-1/2" x 0.131")6" o.c. Toe nail
Built-up girders and beams, 2-inch lumber layers10d (3" x 0.128")Nail each layer: 24" o.c. at top and bottom, staggered; two nails at ends and at each splice
Ledger strip supporting joists or rafters4-16d (3-1/2" x 0.135")At each joist or rafter

1. When nails are clinched, nailing may be reduced by 25 percent.

Table 9 — Title 24 Energy Requirements (Prescriptive) for Climate Zone 7 & 10

Table Capture v1.0

Prescriptive energy requirements (Climate Zones 7 & 10)

ComponentClimate ZoneRequirement
Insulation — CeilingClimate Zone 7R-30
Insulation — CeilingClimate Zone 10R-38 (Option B), R-30 (Option C)
Insulation — WallClimate Zone 7 & 10R-13 + R8 Cont.
Insulation — FloorClimate Zone 7 & 10R-19
Insulation — RoofClimate Zone 7 & 10Radiant barrier required in new roof
Fenestration — TypeDual Pane
Fenestration — Maximum Sq.Ft.20% of FA* totalUF 0.30 or lower
Fenestration — 5% West FacingSHGC 0.23 or lower
Doors — No GlazingUF 0.20 or lower
Doors — Glazing DoorTreated as fenestration

1. All buildings shall comply with the Quality Insulation Installation (QII) requirements in Table 150.1-A or B.

2. The area of any glass removed, as a direct result of the room addition, may be added to the 20% (*FA = floor area).

Deferred Submittal Item

Table Capture v1.0
Deferred Submittal ItemBuilding Type
1. Building exterior envelope (i.e. storefronts, exterior cladding, curtain walls, windows)Commercial and multi-family residential buildings
2. Elevator support railCommercial and multi-family residential buildings
3. Fire alarm systemAll building types
4. Fire sprinkler systemAll building types
5. GuardsCommercial and multi-family residential buildings
6. Metal stairs (structural frame, handrails, guards)Commercial and multi-family residential buildings
7. Precast concrete vaultCommercial and multi-family residential buildings
8. Raised floor systemCommercial and multi-family residential buildings
9. Skylights (custom designed and pre-manufactured)Commercial and multi-family residential buildings
10. Trusses (floor, roof)¹All building types
11. Walk-in cooler (pre-manufactured)Commercial buildings
12. Window washing equipment - Suspension support systemCommercial and multi-family residential buildings
13. Window washing equipment anchorageCommercial and multi-family residential buildings
14. Solar photovoltaic system²All building types
15. Electrical Vehicle Charging StationsAll building types

Preliminary Review Fees — Single Discipline

Table Capture v1.1
ItemFee
Single Discipline Review Flat Fee$1,588.73
Mapping Fee$12.16
DSD Staff Time, Hourly$88.29 for the first half hour and $17.71 for every six minutes thereafter, with a minimum half-hour charge

Mapping Fee is charged when plans, drawings, maps or other geographical documents are utilized for project review.

Preliminary Review Fees — Multiple Discipline

Table Capture v1.1
ItemFee
Multiple Discipline Review Flat Fee$12,983.99
Mapping Fee$12.16
DSD Staff Time, Hourly$88.29 for the first half hour and $17.71 for every six minutes thereafter, with a minimum half-hour charge
Planning Department Review — Public Spaces Planning$196.75
Planning Department Review — Community Planning$198.16
Planning Department Review — Heritage Preservation Planning$177.66
Planning Department Review — Biodiverse SD Planning$201.66

Preliminary Review fees do not include the Planning Department. If a review from the City Planning Department disciplines is requested, these hourly fees will be added to the project.

Demolition / Removal — Submittal Requirements

Table Capture v1.1

R = Required; - = Not required. Superscripts 1-5 reference footnotes in the bulletin.

Submittal ItemRequired at SubmittalRequired at IssuanceBuilding — ResidentialBuilding — Non-ResidentialPool ≤5' Deep — ResidentialPool ≤5' Deep — Non-ResidentialPool >5' Deep — ResidentialPool >5' Deep — Non-Residential
Application PackageR-RRRRRR
Historical Resource InformationR-RRRRRR
Waste Management Form-RR⁴R⁴----
SD Regional Hazardous Materials Questionnaire-RRRR
SDG&E Certification of Discontinuance-RRR----
Site PlanR-
Soils Compaction Report⁵R-----RR
Storm Water Submittal RequirementsR-----

Demolition / Removal — Historic Condition Requirements

Table Capture v1.1
ConditionBuilding RecordPhotosSite Plan
All structures are less than 45 years old--
Any structure is 45 years oldSee Information Bulletin 580 for Supplemental Requirements
Designated Historic Resource or within a Historic DistrictSee Information Bulletin 581 for Supplemental Requirements

Demolition / Removal — Permit Fees

Table Capture v1.1
ItemFee
Demolition/Removal Permit Plan Check Fee$360.36
Demolition/Removal Permit Inspection Fee$332.48
City Planning Department - Historic Review$177.66/hour (if applicable)
DSD - Engineering Review$176.84/hour (if applicable)