What Fees & Costs requires

Permits & approvals required

No permit unique to this section — covered by the project's building permit (see Permits → Permit Requirements).

Review disciplines

  • School District fee processingRequired
    New residential living area is subject to school developer fees collected before permit issuance.
    From the code
    • enclosed space, as applicable. Credits of the school fees for the demolished building may be issued by the appropriate school district. When the scope of development includes demolition of portion of an existing building, the school fee is based on the net increase in area ... assessable space or chargeable covered and enclosed space, as applicable. Issues concerning credits, exemptions, or adjustment of school fees shall be addressed directly to the appropriate school district by the applicant. X. School Fee Rate The City of San Diego determines assessable space for residential SDUSD School Fee Schedule 2026, p. 3
    • R/NR: XXXX/XXXX).” For questions about your user account or assistance with getting the report, contact 619-446-5000. Please contact the applicable school district (s), www.sdcoe.net/schools/finder for instruction on paying school fees. For San Diego Unified School District, refer to https://sandiegounified.org/cms/One.aspx?portalId=27732478&pageId=28486210 Once ... school fees are paid, you will need to digitally upload a receipt or Certificate of Compliance from the respective school district (s) to your Online Permitting Account at the time of Permit Issuance. Reference Table • California Government Code, Section 65995 Visit our web site: sandiego.gov SDUSD School Fee Schedule 2026, p. 3

Submittal requirements

No submittal specific to this section for this project.

Fees

  • Building plan-check & permit feesVerify
    Valuation-based — provide a construction valuation to estimate (look up in the DSD fee schedule)
    These scale with construction valuation per the City's published schedule; the exact figure is read from that schedule, not computed here.
    From the code
    • Fee Schedule for Construction Permits- Structures INFORMATION BULLETIN IN THIS BULLETIN: When Fees are Paid Sign Permit Fees 501 Submittal Fees Building Plan Check & Inspection Fees December 2025 Issuance Fees Partial Permit Plan Check & Inspection Fees Enhanced/Optional Services View All Information Bulletins Miscellaneous Items Plan ... Check and Other Fees Inspection Fees Fire Permits Water/Sewer Plan Check Fees Electrical, Mechanical, Plumbing/Gas Enhanced/Optional Services Permits References Demolition, Removal Permit Fees Previous Versions This Information Bulletin lists the fees collected by the City of San Diego for construction permits (building permits). It also SD Information Bulletin 501, p. 1
    • Planning Department plan check fees are collected through the Development Services Department. The fee is charged at permit issuance. Fire Permits Additional fees are charged for fire protection systems, including fire sprinklers, fire alarms and kitchen hood suppression systems. For Fire Permit fees, see Information ... Bulletin 506, Fee Schedule for Fire Permits. Electrical, Mechanical, Plumbing/Gas Permits Additional fees are charged for specific electrical, mechanical and plumbing/gas installations for multifamily and nonresidential construction projects (see Information Bulletin 103, Fee Schedule for Mechanical, Electrical, Plumbing/Gas Permits). Electrical, Mechanical, Plumbing/Gas Permits SD Information Bulletin 501, p. 1
  • School developer feeVerify
    ≈ $4,304 estimate (800 sq ft × $5.38/sq ft) — verify the current SDUSD rate
    Charged on new residential living area before permit issuance. The per-sq-ft rate changes; confirm the current SDUSD rate.
    From the code
    • enclosed space, as applicable. Credits of the school fees for the demolished building may be issued by the appropriate school district. When the scope of development includes demolition of portion of an existing building, the school fee is based on the net increase in area ... assessable space or chargeable covered and enclosed space, as applicable. Issues concerning credits, exemptions, or adjustment of school fees shall be addressed directly to the appropriate school district by the applicant. X. School Fee Rate The City of San Diego determines assessable space for residential SDUSD School Fee Schedule 2026, p. 3
    • purposes that is thereby exempt from property taxation under California law. B. Any facility used exclusively as a private full-time day school as described in Section 48222 of the California Education Code. C. Any facility that is owned and occupied by one or more ... resulting increase in assessable space that does not exceed 500 square feet. (California Education Code, Section 17620(a)(1)(C)). IX. School Fee Credit and Exemptions The City will report to the appropriate school district the applicable assessable space or, the chargeable covered and enclosed SDUSD School Fee Schedule 2026, p. 3
  • Development Impact FeesRequired
    Apply — an ADU ≥ 750 sq ft may be charged impact fees proportional (by sq ft) to the primary dwelling
    Proposed area ≥ 750 sq ft.
    From the code
    • Fees. Specified that an ADU or JADU that contains less than 500 square feet of interior livable space does not increase assessable space. Revised the limitations on impact fees to prohibit impact fees on the development of an ADU that has 750 square feet CA HCD ADU Handbook 2024, p. 15
    • Chapter 520, Statutes of 2025) made various changes to State ADU Law (Gov. Code, §§ 66311, 66313, 66317, 66320, 66323; 66324; 66327; 66325; 66332 and added sections 66335; 66335.5; and 66339.5) regarding requirements for local jurisdictions when submitting ordinances to HCD and went into effect ... authority with respect to terms, references, and standards for JADUs (Gov. Code, § 66311). • Revises the limitations on impact fees to, instead, prohibit impact fees upon the development of an ADU that has 750 square feet of interior livable space or less or JADU that CA HCD ADU Handbook 2024, p. 46
  • Water/sewer capacity & connection chargesVerify
    Separate capacity/connection charges may apply for a new or upsized connection
    From the code
    • whether or not a change is being made to a meter. The plan check fee is based per EDU and is charged for both irrigation and domestic meters. For the purposes of assessing these fees, 20 fixture units are given a value ... Table 501D lists Water and Sewer plan check fees. Water & Sewer Capacity Fees Water and Sewer Capacity Fees are collected on behalf of the Public Utilities Department and are determined during the plan review process. A capacity fee is collected for the maintenance/operation of present SD Information Bulletin 501, p. 1
    • Water services and sewer lateral installation fees associated with new construction are collected on behalf of the Public Utilities Department and are determined during the building permit plan review process. See “Schedule for Water and Sewer Fees” for water and sewer services, including potable ... reclaimed water for the City of San Diego. A Water Meter Data Card (DS-16) is used to determine the correct size required for the water meter, service and sewer lateral. Storm Water High Priority & Areas of Special Biological Significance (ASBS) Inspection Fee The Regional SD Information Bulletin 501, p. 1

Reference documents

Applicable documents — Fees / Fees & Costs · 8 · click to expand

RankTopics CoveredSection Citation
1
City of San Diego — Development Impact Fee Schedule 2026
Development impact fees
SD Development Impact Fee Schedule
2
San Diego Unified School District — Developer Fee Schedule 2026
School fees
SDUSD School Fee Schedule 2026
3
City of San Diego Information Bulletin 400 — Accessory Dwelling Unit / Junior ADU
Permit application, Ministerial review
SD Information Bulletin 400
4
City of San Diego Information Bulletin 101 — Building Valuation Schedule
Building valuation
SD Information Bulletin 101
5
City of San Diego Information Bulletin 103 — Fee Schedule for Mechanical, Electrical, Plumbing / Gas Permits
MEP fees
SD Information Bulletin 103
6
City of San Diego Information Bulletin 501 — Fee Schedule for Construction Permits — Structures
Construction permit fees
SD Information Bulletin 501
7
City of San Diego Information Bulletin 503 — Fee / Deposit Schedules for Development & Policy Approvals
Development approval fees
SD Information Bulletin 503
8
City of San Diego Information Bulletin 506 — Fee Schedule for Fire Permit Fees
Fire permit fees
SD Information Bulletin 506

Reference tables (16)

Occupancy Group

Table Capture v1.0
Occupancy GroupIAIBIIAIIBIIIAIIIBIVVAVB
A-1 Assembly, theaters w/ stage335.89324.58316.94304.93286.87278.00295.62266.02257.55
A-1 Assembly, theaters w/o stage307.39296.08288.44276.42258.37249.50267.12237.51229.05
A-2 Assembly, nightclubs269.94261.93254.48245.85230.56223.99237.02209.57202.79
A-2 Assembly, restaurants, bars, banquet halls268.94260.93252.48244.85228.56222.99236.02207.57201.79
A-3 Assembly, churches311.88300.57292.93280.91263.30254.43271.60242.45233.98
A-3 Assembly, general, community halls, libraries, museums266.07254.76246.12235.10216.33208.46225.80195.47188.01
A-4 Assembly, arenas306.39295.08286.44275.42256.37248.50266.12235.51228.05
B Business260.69251.13241.86231.65210.99202.73222.56186.21177.81
E Educational273.46263.96255.62245.04228.69217.00236.61200.36193.94
F-1 Factory & industrial mod-hazard160.20152.78143.34138.64123.55117.41132.48102.4495.93
F-2 Factory & industrial low-hazard159.20151.78143.34137.64123.55116.41131.48102.4494.93
H-1 High Hazard, explosives149.46142.04133.60127.90114.12106.97121.7493.00N.P.
H-2 H-3 H-4 High Hazard149.46142.04133.60127.90114.12106.97121.7493.0085.50
H-5 HPM260.69251.13241.86231.65210.99202.73222.56186.21177.81
I-2 Institutional, nursing homes302.01292.45283.18272.97253.83N.P.263.88229.05N.P.
I-3 Institutional, restrained295.86286.31277.03266.83247.95238.69257.74223.17212.77
I-4 Institutional, daycare facility262.22252.95244.31235.67215.42209.47235.71193.82187.73
M Mercantile201.37193.36184.91177.28161.72156.15168.45140.73134.95
R-1 Residential, hotels264.67255.41246.77238.13218.35212.40238.17196.75190.67
R-2 Residential, multiple family221.32212.06203.42194.78175.96170.01194.82154.36148.28
R-3 Residential, one/two family209.61203.74198.94195.12188.41181.45191.77175.86165.67
R-4 Residential, care/assisted living facilities262.22252.95244.31235.67215.42209.47235.71193.82187.73
S-1 Storage, moderate hazard148.46141.04131.60126.90112.12105.97120.7491.0084.50
S-2 Storage, low hazard147.46140.04131.60125.90112.12104.97119.7491.0083.50
U Utility, miscellaneous114.09107.3799.8995.6085.1379.5490.9967.3964.19

Structure or Item Valuation

Table Capture v1.0
Structure or ItemValuationStructure or ItemValuation
Agricultural Building$59 /sq ftPile Foundations
Aluminum Siding$18 /sq ftCast-in-place concrete piles$66 /lf
AntennasSteel piles$161 /lf
Radio over 30 ft high$10,876 eaRetaining Wall
Dish, 10 ft diameterConcrete or Masonry$55 /sq ft
w/decoder$13,213 eaRe-roofing
Awning or CanopyNote: 1 square = 100 square feet
(Supported by Building)Built-up
Aluminum$65 /sq ftAsphalt based Low Slope$494 /sq
Canvas$28 /sq ftSingle-Ply$803 /sq
Balcony$45 /sq ftCoating$265 /sq
Carport$26 /sq ftFiberglass$442 /sq
Commercial Coaches$3,624 eaOverlay$362 /sq
Decks (wood)$45 /sq ftAluminum$1,766 /sq
Demolition of Building$8 /sq ftClay Tile$803 /sq
Dwelling Solariums$149 /sq ftConcrete Tile$723 /sq
Fence or Freestanding WallMetal Standing Seam$2,249 /sq
Wood or Chain Link$6 /sq ftRoof Structure Replacement$46 /sq ft
Wood Frame with Stucco$18 /sq ftSaunas (Steam)$21,060 ea
Wire$6 /sq ftSpa or Hot Tub$22,291 ea
Masonry$28 /sq ftStairs (Ramps)$45 /sq ft
Wrought Iron$18 /sq ftStone and Brick Veneer$20 /sq ft
FireplaceStorage Racks$3 /cu ft
Concrete or masonry$11,214 eaSuspended Ceilings$16 /sq ft
Prefabricated metal$7,281 eaSwimming Pool
Greenhouse$18 /sq ftPer sq ft of surface area
Manufactured Housing$75 /sq ftVinyl-lined$104 /sq ft
Mobile Home$75 /sq ftGunite$114 /sq ft
PatioFiberglass$124 /sq ft
Wood Frame with Cover$28 /sq ftTenant Improvements$104 /sq ft

Structure or Item Valuation

Table Capture v1.0
Structure or ItemValuation
Interior Partition$151 /lf
Install Windows or Sliding Glass Doors$46 /sq ft of opening
Close Exterior Wall Opening$45 /sq ft of opening

Table 1A - Mechanical Fee Schedule (Per Building)

Table Capture v1.0

The following fees are for mechanical systems that serve the specified use (for example, the hotel fee includes mechanical systems serving hotel rooms). Mechanical systems serving mixed uses shall be charged based upon each fee listed in Table 1A or Table 1B, as applicable.

Qualifies for Simple Permit-MEPUseUnitFirst UnitEach Add'l Unit
NoHotel New MechPer Guest Room$353.13$87.68
NoMultiple Dwelling Unit (MDU) - New MechanicalFirst 3 Units$353.13-
NoMultiple Dwelling Unit (MDU) - New MechanicalNext 4 -50 Units-$87.68
NoMultiple Dwelling Unit (MDU) - New MechanicalAdd'l 10 Units over 50-$529.71
NoMDU Remodel- New MechanicalEach Unit$264.25$43.84
NoNon-Residential Shell¹Per Floor$440.82-
NoNon-Residential Tenant Improvement-MechanicalEach 5,000 sf$176.57-
NoExhaust System (Garage)Each System$299.54$87.68

1 Non-residential shell fee shall be used when the shell building includes the heating/cooling systems. For shell buildings that do not include the heating/cooling system, each individual system shall be charged per Table 1B.

2 Replacement of these systems requires a HERS rating when more than 40 feet of duct is in unconditioned space. See Section I(C) for details.

3 4 separate Building Permit is required when scope of work includes drywall, wood framing or replacing/installing new finishes in MDU or non-residential building.

4 A separate Electrical Permit is required if electrical circuits/devices are installed/modified in a MDU or non-residential building.

Table 3A - Plumbing Fee Schedule (Per Building Use)

Table Capture v1.0

The following fees are for plumbing systems that serve the specified use (for example, the hotel fee includes all plumbing systems serving hotel rooms). Plumbing systems serving mixed uses shall be charged based upon each fee listed in Table 3A or Table 3B, as applicable.

Qualifies for Simple Permit-MEPUseUnitFirst UnitEach Add'l Unit
NoHotels New-PlumbingPer Guest Room$264.25$52.39
NoLaboratory w/out restroomsEach 5 Fixtures$264.25$52.39
NoMultiple Dwelling Unit Building (MDU - New)Each Dwelling Unit$264.25$176.57
NoMDU Building - RemodelEach Dwelling Unit$264.25$52.39
NoNon-Residential KitchenEach 5 Fixtures$353.13$122.97
NoNon-Residential RestroomsEach 5 Fixtures$264.25$70.58
NoNon-Residential Shell (not including restrooms)Each Floor$264.25$122.97
NoNon-Residential Plumbing Tenant Improvement (not including restrooms or kitchen)Each Floor$264.25$122.97
NoParking Garages- PlumbingPer Floor$264.25$52.39
YesResidential buildings (Group R-2 or R-3 occupancy only) - existing Kitchen/Bathroom Remodel with no changes to structural elements, wall framing or exterior walls and no added plumbing fixtures/gas appliances. (Information Bulletin 203)¹Per Dwelling Unit$440.82-

Table 3A and 3B Definitions and Footnotes

Definition: Fixtures- Plumbing fixtures

1. This fee includes the cost of a no-plan combination permit for all plumbing, mechanical, and electrical work. Plans will be required if the scope of work includes any framing.

2. A separate Building Permit is required when the scope of work includes drywall, wood framing or replacing/installing new finishes in MDU or non-residential building.

3. A separate Electrical Permit is required if electrical circuits/devices are installed/modified in an MDU or non-residential building.

4. The FEWD "Plan Check List" must be provided at the time of inspection. See Item (G) for details.

5. For non-residential or MDU buildings, replacing a water heater with a tankless water heater requires plans and plan review.

Construction Permit Fees — Plan Review & Inspection (Miscellaneous)

Table Capture v1.1

Miscellaneous plan review and inspection fees, including enhanced (after-hours) inspections.

ItemFee
Plan Review
Addressing$529.71
Application Extension—Project$176.57
Permit Extension$353.13
Hourly DSD$176.84
Hourly DSD OT$264.87
Inspection
Hourly-DSD$176.84
Hourly-DSD OT$264.87
Enhanced Inspections
Late Night/Weekend/Holiday$264.87/Hr
Before or After Hours$529.74/ea

*For Enhanced Inspections see Information Bulletin 120.

Table 501A — New Construction

Table Capture v1.3
Project TypeBase Sq. Ft.Plan Check — Base RatePlan Check — Increment RateInspection — Base RateInspection — Increment Rate
New Commercial1$4,566.31-$1,570.80-
New Commercial3,000$4,566.31$1.57$1,570.80$0.48
High Rise21$11,567.82-$10,350.16-
High Rise250,000$11,567.82$0.24$10,350.16$0.24
Master Plan-Est-MDU (Master Plan Establishment-Multi Dwelling Unit) *For Production see Footnote 41$15, 099.06---
Master Plan-Est-MDU (Master Plan Establishment-Multi Dwelling Unit) *For Production see Footnote 420,000$15,099.06$0.72--
New MDU (New Multi Dwelling Unit)1$4,627.13-$2,130.97-
New MDU (New Multi Dwelling Unit)5,000$4,627.13$0.97$2,130.97$0.48
Res-MDU & Non Res-Addition (Residential Multi-Dwelling Unit & Non-Residential Addition)1$1,199.36-$858.50-
Res-MDU & Non Res-Addition (Residential Multi-Dwelling Unit & Non-Residential Addition)500$1,199.36$2.41$858.50$1.68
Standalone Parking Garage1$6,331.87-$2,435.34-
Standalone Parking Garage10,000$6,331.87$0.60$2,435.34$0.24
Res-SDU/DUP (Single Dwelling Unit /Duplex/detached Group R-3 ADU over 500 or addition/remodel, including attached ADU/JADU over 1,100 SF)1$8,085.26-$8,401.90-
Res-SDU/DUP (Single Dwelling Unit /Duplex/detached Group R-3 ADU over 500 or addition/remodel, including attached ADU/JADU over 1,100 SF)3,000$8,085.26$4.10$8,401.90$4.21
Repetitive Strct-SDU/DUP4 (Repetitive Structure Single Dwelling Unit /Duplex/)First Additional Unit$2,120.01Use Rates Above
Repetitive Strct-SDU/DUP4 (Repetitive Structure Single Dwelling Unit /Duplex/)Subsequent Units (Each)$793.95Use Rates Above
Res-SDU/DUP Add/Remodel (Residential-Single Dwelling Unit/Duplex Addition/Remodel, including attached ADU/JADU to 1,100 SF and detached ADU up to 500 SF)1$3,512.92-$2,228.29-
Res-SDU/DUP Add/Remodel (Residential-Single Dwelling Unit/Duplex Addition/Remodel, including attached ADU/JADU to 1,100 SF and detached ADU up to 500 SF)500$3,512.92$6.98$2,228.29$4.46
Manufactured/FBH SDU (Manufactured Factory Built Housing Single Dwelling Unit)Each$5,776.62-$3,310.82-
Tenant Improvement/Remodel (All occupancies excluding R-3)1$2,532.77-$1,315.10-
Tenant Improvement/Remodel (All occupancies excluding R-3)2,000$2,532.77$1.33$1,315.10$0.60
TI/Remodel Rapid Review (Tenant Improvement/Remodel Rapid Review, All Occupancies)1$840.20-$2,143.14-
TI/Remodel Rapid Review (Tenant Improvement/Remodel Rapid Review, All Occupancies)1,000$840.20$0.85$2,143.14$2.17
Factory Built Housing MDU1$12,785.50-$8,767.19-
Factory Built Housing MDU30,000$12,785.50$0.43$8,767.19$0.30
Attached Townhomes1$14,100.60-$12,054.89-
Attached Townhomes6,000$14,100.60$2.41$12,054.89$2.05
Repetitive Strct-TH3 (Repetitive Structure-Town Home)Each$706.27-Use Townhomes Fees
Warehouse/Self-Storage1$11,202.53-$7,062.47-
Warehouse/Self-Storage20,000$11,202.53$0.60$7,062.47$0.36
Repetitive Strct-Non Res/MDU4 (Repetitive structure Non-Residential or Multi Dwelling Unit4)Each$3,002.73-Use appropriate inspection fees as applicable per building type

1 Fees are based upon the use as defined by the California Building Code (CBC). For mixed-use buildings (e.g., residential/commercial projects), fees will be applied based on the square footage of each use within the structure.

2 Definitions: High Rise - Any building having occupied floors 75’ or more above the lowest floor level having building access, regardless of occupancy type. Tenant Improvement/Remodel - This fee will be used for a building permit that is required to allow a new shell building or space to be occupied.

3 Repetitive Strct-SDU/DUP& TH - This fee will be charged when repetitive single-dwelling unit, duplex or townhomes are identical and are submitted at the same time. The applicable inspection fee will be charged for each structure based on size of the building.

4 The Repetitive Structures Fee will be charged when a repetitive multi-dwelling unit or non-residential structures are identical and are submitted at the same time. The applicable inspection fee will be charged for each structure based on CBC use and size of the building.

5 Plan check and Inspection’s base square feet (area calculation) includes the thickness of exterior walls . Areas of the building not provided with surrounding walls shall be included in the building area if such areas are included within the horizontal projection of the roof or floor above such as balconies.

Partial Construction Permit Fees

Table Capture v1.1

Base rate applies at the first square foot; increment rate applies per square foot above the listed base square footage. "-" = not applicable. Superscripts 1-4 reference footnotes in the bulletin.

Project TypeBase Sq. Ft.Plan Check Base RatePlan Check Increment RateInspection Base RateInspection Increment Rate
Partial-Foundation1$5,479.50-$2,922.40-
Partial-Foundation15,000$5,479.50$0.36$2,922.40$0.24
Partial-Frame1$9,741.32-$3,409.47-
Partial-Frame20,000$9,741.32$0.48$3,409.47$0.12
Partial-Shell & Non-Res BO (Partial Shell & Non-Residential Buildout)1$18,995.59-$3,896.53-
Partial-Shell & Non-Res BO (Partial Shell & Non-Residential Buildout)20,000$18,995.59$0.97$3,896.53$0.24
Partial Res BO to Occupy (Partial Residential Buildout to Occupy)1$32,146.39-$14,612.00-
Partial Res BO to Occupy (Partial Residential Buildout to Occupy)40,000$32,146.39$0.85$14,612.00$0.36
Partial-High Rise Foundation1$17,047.32-$7,793.06-
Partial-High Rise Foundation40,000$17,047.32$0.48$7,793.06$0.24
Partial-High Rise Frame1$4,870.66-$2,435.34-
Partial-High Rise Frame40,000$4,870.66$0.12$2,435.34$0.06
Partial-High Rise Shell1$12,785.50-$4,261.84-
Partial-High Rise Shell50,000$12,785.50$0.24$4,261.84$0.09
Partial-High Rise Buildout1$1,826.50---
Partial-High Rise Buildout50,000$1,826.50$0.03--
Piles, Pile Cap and Grade BeamEach$1,059.40---

Table 501C — Miscellaneous Structures

Table Capture v1.3
Project TypeUnitPlan Check — Base RatePlan Check — Each Add’lInspection — Base RateInspection — Each Add’l
AntennaFirst 5$2,207.58-$529.71-
Antenna6 or more$2,473.03-$1,059.40-
Awnings/CanopiesEach 5$1,765.68$1,235.97$617.38$264.25
Carport/Shade Up to 500 sq. ft.1Each$1,501.42-$617.38-
Carport/Shade 501-3000 sq. ft.1Each$1,854.57-$617.38-
Carport/Shade >3000 sq. ft.1Each$2,384.15-$793.95-
State Appr. Comm Modular1 (State -Approved Commercial Modular1)Each$2,826.17-$353.13-
Deck-Pre-Approved PlansEach Building$1,148.29-$264.25-
Deck (SDU/DUP/TH) (Each) (Deck-Single Dwelling Unit/Duplex/Townhome/Multi-Dwelling Unit)Up to 500 sq. ft.$1,677.99-$264.25-
Deck (SDU/DUP/TH) (Each) (Deck-Single Dwelling Unit/Duplex/Townhome/Multi-Dwelling Unit)>500 sq. ft.$2,649.60-$440.82-
Demolition – Partition Only (Res) (Demolition-Partition Only- Residential)Each Building$353.13---
Door/Window – (New/Replace)Each 3$793.95$440.82$176.57$176.57
Equipment PadEach$1,501.42-$264.25-
Fence (Mas/Non-Mas)3 (Fence/Wall-Masonry/Non-Masonry)> 7’ high, per 100 LF$2,031.00$970.52$529.71$353.13
Fence (Mas/Non-Mas) City Std3 (Fence/Wall Masonry/Non-Masonry-City Standard)Each 100 LF$1,148.29$1,148.29$353.13$353.13
Fireplace1Each$1,235.97-$353.13-
Foundation RepairEach Building$2,120.01-$353.13-
Garage/Storage-SDU/DUP/TH (Garage/Storage-Single Dwelling Unit/Duplex/Townhome)Each$1,501.42-Hourly-
Garage/Storage-Non-Res/MDU1 (Garage/Storage-Non-Residential/Multi-Dwelling Unit)Each 200 sq. ft.$3,002.73$1,677.99$353.13$353.13
Greenhouses1Each$2,913.84$1,412.54$353.13$353.13
Patio Cover – Pre-Approved1Each$1,501.42-$353.13-
Patio Cover-SDU/DUP/TH1 (Patio Cover – Single Dwelling Unit/Duplex/Townhome)Each$1,412.54-$529.71-
Pole/Pole with ElectricalFirst 10$1,677.99-$353.13-
Pole/Pole with ElectricalEach additional 10---$176.57
Pole/Pole with Electrical11 or more$2,913.84---
Pool/Spa, Private CustomEach$2,649.60-$529.71-
Pool/Spa, SDU/DUP/TH per MP (Pool/Spa, Single Dwelling Unit/Duplex/Townhome-Per Master Plan)Each$971.73-$529.71-
Pool/Spa, – Per Master PlanEach$1,677.99-$440.82-
Repair/Replace In KindEach Building--$529.71-
Retaining Wall, City StandardEach 50 LF$ 1,677.99$1,148.29$353.13$176.57
Retaining Wall, With Calculations3< 6’ high, per 50 LF$2,207.58$1,148.29$529.71$176.57
Retaining Wall, With Calculations3> 6', per 50 LF$2,913.84$1,148.29$529.71$264.25
Roof Re-sheathing, Non-Res/MDUEach BuildingHourly2-$264.25-
Roof Re-sheathing, SDU/DUP/THEach BuildingHourly2-$264.25-
Roof Structure ReplacementEach 2,000 sq. ft$1,942.13$617.38$264.25$264.25
Sidewalk Café-BuildingEach$3,885.57-$264.25-
Siding/Stucco/VeneerEach 1,000 sq. ft$529.71$264.25$353.13$176.57
SkylightEach 3$970.52-$176.57-
Storage RacksEach Type$1,589.11$706.27--
Storage RacksFirst 100 LF--$264.25-
Storage RacksEach add’l 100 LF---$176.57
RepetitiveStrct-Misc 1 (Repetitive structure - Miscellaneous)Each$353.13---
Hazmat Review (P) Add-OnEach$706.27

1 The repetitive structure plan check fee will be charged when repetitive structures in Table 501C are identical and are submitted at the same time. The applicable inspection fee will be charged for each structure.

2 If plans are required per Information Bulletin 123, Renewal of Roof Coverings, plan check fees will be charged hourly.

3 Fences, walls or retaining walls with varying heights will be calculated using the greatest wall height.

Construction Permit Fees — Water/Sewer Service (by EDU)

Table Capture v1.1

EDU = Equivalent Dwelling Unit. Add-on items are assessed in addition to the base fee when the project includes them.

Project TypeIncrementBase RateIncrement Rate
Service Fees
Non-Residential and Multi-Dwelling Unit, New Water MeterUp to 3 EDUs$529.71
Non-Residential and Multi-Dwelling Unit, New Water MeterUp to 4 EDUs$1,059.42
Non-Residential and Multi-Dwelling Unit, New Water MeterEach add'l EDU (or fraction thereof)$43.84
Non-Residential and Multi-Dwelling Unit, No Water Meter ChangeUp to 3 EDUs$440.82
Non-Residential and Multi-Dwelling Unit, No Water Meter ChangeUp to 4 EDUs$706.27
Non-Residential and Multi-Dwelling Unit, No Water Meter ChangeEach add'l EDU (or fraction thereof)$43.84
SDU/Duplex/Townhome, New Meter and UpgradeEDU$353.13
SDU/Duplex/Townhome, No Water Meter ChangeEA$176.57
Add-on Items
New Backflow PreventerEach$176.57
Per Floor (Above 3 Levels)Each Floor$87.68

Development Review — Discretionary Hourly Plan Check Fees

Table Capture v1.1

Hourly plan check fees applied by the City Planning Department for discretionary review disciplines.

Review TypeHourly FeeDescription
Public Spaces$196.75An hourly plan check fee will be applied for the calculation and assessment of Development Impact Fees, which are fees imposed on projects to cover all or part of the cost of new public facilities related to new development.
Community Planning$198.16An hourly plan check fee will be applied to larger and complex proposed development projects that require a decision on consistency with the General Plan and Community Plans. These fees support the evaluation of projects to ensure alignment with the City's General Plan and any applicable Community Plan.
Heritage Preservation$177.66An hourly plan check fee will be applied for Designated Historical Resource Review or Potential Historical Resource Review. A minimum of one hour is collected at the time of initial submittal. Additional hours may be charged during the review process, with supplemental invoices issued as necessary.
Biodiverse SD$201.66An hourly plan check fee will be applied to discretionary projects within and adjacent to the Multi-Habitat Planning Area (MHPA) for the review and assessment of Biodiverse SD compliance, including compliance with the Multiple Species Conservation Program and Vernal Pool Habitat Conservation Program. These fees support the evaluation of projects to ensure alignment with the conservation goals of Biodiverse SD, including the preservation of biological resources, natural vegetation communities, and habitats for covered species.

Development Review — Project Fee by Type

Table Capture v1.1
Fee TypeFee
Residential Projects$915.72 per unit
Non-Residential Projects$1,617.05 per 1,000 square feet

Table 503A — Fee/Deposit Schedule for Development & Policy Approvals

Table Capture v1.3
Fee TypeFeeTotal Fee
ADMINISTRATIVE FEES1 Discretionary Project Closeout Mapping$1,264.48 $12.16$1,264.48 $12.16
SUBTOTAL – ADMINISTRATIVE FEES$1,276.64
APPROVAL TYPE (CHOOSE ONE)
Emergency Coastal Development Permit and/or Site Development Permit$17,488.14
Coastal Development Permit-Single Dwelling Unit/Companion Units (Process 2 Decisions Only)$30,914.15
Coastal Development Permit/Map Waiver—Condominium Creation$22,788.66
Coastal Development Permit/Map Waiver—Condominium Conversion$19,254.90
Easement Vacation (Process 2)$12,895.10
Extension of Time—Development Permits and/or Tentative Maps$21,374.91
Map Waiver—Condominium Conversion$18,901.89
Map Waiver—Condominium Creation$20,688.65
Map Waiver —Stand Alone$10,245.50
Neighborhood Development Permit$14,838.42
Neighborhood Use Permit (not Sidewalk Café)$10,952.85
Neighborhood Use Permit for Sidewalk Café$19,962.38
Staff Time – Hourly2$88.29 for the first half hour and $17.71 for every six minutes thereafter, with a minimum half-hour charge.
Surface Mining & Reclamation Act Compliance (SMARA)$4,416.48
Tentative Map Exemption$18,372.18
Tentative Map/Vesting Tentative Map—Stand Alone$18,372.18
Variance$20,315.51
*Note: Projects including more than one of the above approval types will require a deposit account, per Table 503B
SUBTOTAL – PLAN CHECK FEE$
ENVIRONMENTAL EXEMPTION
Environmental Initial Study/Exemption$1,412.54
Environmental Initial Study Extended/Exemption (collected if Initial Study is extended)$27,028.58
SUBTOTAL – ENVIRONMENTAL EXEMPTION FEE$
TOTAL FEES DUE AT PROJECT SUBMITTAL$

1Most Development Services fees change annually in July, including those not in this table. Please make sure you have the current version of this Information Bulletin.

2Reviews/meetings after the third review cycle, and any meetings that may exceed what staff deems reasonable during the first three reviews, will incur this fee.

Table 503B / Deposit Account Worksheet

Discretionary Approval Deposits (by Approval Type)

Table Capture v1.1

Administrative fees: Discretionary Project Closeout $1,264.48; Subtotal – Administrative Fees $1,276.64. Choose all approval type(s) that apply; initial deposit and subsequent review / minimum balance shown per approval. Superscripts 1-3 reference footnotes in the bulletin.

Approval TypeInitial DepositSubsequent Review and Minimum Balance
Amendment to Prior Discretionary PermitN/ASame as permit/approval
Coastal Development Permit$8,000.00$4,000.00
Conditional Use Permit$8,000.00$4,000.00
Development Agreement$10,000.00$5,000.00
Easement Vacation$6,200.00$3,100.00
Land Use Plan (new or amendment)$12,000.00$6,000.00
Local Coastal Program (new or amendment)$10,000.00$5,000.00
Map Waiver$5,000.00$2,500.00
Neighborhood Development Permit$8,000.00$4,000.00
Neighborhood Use Permit$5,000.00$2,500.00
Planned Development Permit$10,000.00$5,000.00
Public Right of Way Vacation$6,200.00$3,100.00
Rezone$12,000.00$6,000.00
Site Development Permit$8,000.00$4,000.00
Street Name Change (Process 5)$2,500.00$1,200.00
Tentative Map/Vesting Tentative Map$10,000.00$5,000.00
Variance$8,000.00$4,000.00

Table 506A — Fire Permit Fees

Table Capture v1.3
Fee TypePlan CheckInspection
Fire Alarm-New High Rise Up to 11 Floors, Residential *$2,473.03 (Flat Fee)$529.71 per Floor
Fire Alarm-New High Rise 12 or More Floors, Residential *$3,179.30 (Flat Fee)$529.71 per Floor
Fire Alarm-New High Rise up to 11 Floors, Non-Residential*$2473.03 (Flat Fee)$529.71 per Floor
Fire Alarm-New High Rise 12 or More Floors, Non-Residential*$3,179.30 (Flat Fee)$529.71 per Floor
Fire Alarm -New (First 20 devices)$353.13$353.13
Fire Alarm-New (Additional 10 devices)$87.68$87.68
Fire Alarm-Alt. to Existing System (First 20 devices)$176.57$440.82
Fire Alarm-Alt. To Existing System (Each additional 10 devices)$87.68$87.68
Fire Alarm-Sprinkler Monitoring (Each Panel/System)$264.25$353.13
Fire Alarm Affidavit-Form DS-163 (First 4 Devices)$87.68$264.25
Fire Alarm Affidavit-Form DS-163 (Fee if more than 4 devices)$528.50
Fire Alarm-High Rise Panel Replacement (Per Floor)*$176.57$176.57
Fire Alarm -Panel Replacement (First 20 Devices)$176.57$299.54
Fire Alarm-Panel Replacement (Each Additional 10 Devices)$87.68$52.39
Kitchen Hood Suppression System$264.25$353.13
Special Suppression-Clean Agent, Foam, Dry Chemical, Gaseous (Up to 10 Devices)$882.84$529.71
Special Suppression (Each Additional 10 Devices)$706.27$529.71
Fire Sprinkler-New High Rise up to 11 Floors, Residential*$3,532.44 (Flat Fee)$706.27 per Floor
Fire Sprinkler-New High Rise 12 or More Floors, Residential*$4,593.05 (Flat Fee)$706.27 per Floor
Fire Sprinkler-New High Rise up to 11 Floors, Non-Residential*$2473.03 (Flat Fee)$882.84 per Floor
Fire Sprinkler- New High Rise 12 or More Floors, Non-Residential*$3,885.57 (Flat Fee)$882.84 per Floor
Fire Sprinkler-New Non-Residential/MDU (First 50 Sprinklers)$706.27$882.84
Fire Sprinkler-New Non-Residential/MDU (Each Additional 50 Sprinklers)$176.57$440.82
Fire Sprinkler-Alt. to Existing Non-Residential/MDU (First 50 Sprinklers)$353.13$617.38
Fire Sprinkler-Alt. to Existing Non-Residential/MDU (each Additional 50 Sprinklers)$353.13$353.13
Fire Sprinkler-New SDU, Duplex, Townhome (≤ 50 Sprinklers)$353.13$440.82
Fire Sprinkler-New SDU, Duplex, Townhome (> 50 Sprinklers)$617.38$706.27
Fire Sprinkler-Addition/Remodel of SDU, Duplex, Townhome$264.25$264.25
Fire Sprinkler Head Replacement (First 100 Sprinklers)$353.13Utilize Fire Sprinkler -Alt. to Existing Fees
Fire Sprinkler Head Replacement (Each Additional 100 Sprinklers)$353.13
Fire Sprinkler-Underground (First 200 Linear Feet)$264.25$264.25
Fire Sprinkler-Underground (Each Additional 200 Feet)$176.57$264.25
Fire Sprinkler Affidavit-Form DS-161, 0 Sprinklers Added/Altered$87.68$176.57
Fire Sprinkler Affidavit-Form DS-161, 1-20 Sprinklers Added/Altered$87.68$440.82
Fire Sprinkler-New Backflow Without Calculations$176.57$176.57
Fire Sprinkler-New Backflow, With Calculations$529.71$176.57
Standpipe System, No Sprinkler System (Up to 10 Outlets)$440.82$529.71
Standpipe System, No Sprinkler System (Each Additional 10 Outlets)$176.57$353.13

*High-Rise is any building with an occupied floor more than 75 feet above the lowest Fire Department Vehicle access level.

The fees listed in Table 506B below are in addition to those listed in Table 506A. They will be added to applicable projects during the plan review process.

Table 506B — Fire Permit Additional Fees

Table Capture v1.1

Additional fire permit fees for systems not covered by the base fire fee schedule (Table 506A). * see bulletin footnote for high-rise applicability.

Fee TypePlan CheckInspection
Fire Alarm-Smoke Control for Non-High-Rise Buildings*$706.27$353.13
Fire Pump Only (Non-High Rise)*$882.84$793.95
Hourly Rate for Services Not Covered Above$176.84$176.84