City of San Diego Information Bulletin 101 — Building Valuation Schedule
Development Services Site Menu DSD Home Permits, Approvals & Inspections News & Programs Zoning Codes & Regulations Forms & Publications Public Hearings, Meetings & Notices Fees Records Building & Land Use Enforcement Building Valuation Schedule INFORMATION BULLETIN 101 January 2024 View All Information Bulletins IN THIS BULLETIN: Miscellaneous Valuations Alterations to Existing Structures This Information Bulletin provides construction valuation amounts used to determine the building valuation for new construction, miscellaneous building projects as well as alterations and additions. Please refer to Information Bulletin 501 for applicable permit and permit application fees. The following Building Valuation Data has been provided by the International Code Council (ICC) dated August 2023 to determine the building valuation and provides average construction costs on a per square foot basis.
Occupancy Group IA IB IIA IIB IIIA IIIB IV VA VB A-1 Assembly, theaters w/ stage 335.89 324.58 316.94 304.93 286.87 278.00 295.62 266.02 257.55 A-1 Assembly, theaters w/o stage 307.39 296.08 288.44 276.42 258.37 249.50 267.12 237.51 229.05 A-2 Assembly, nightclubs 269.94 261.93 254.48 245.85 230.56 223.99 237.02 209.57 202.79 A-2 Assembly, restaurants, bars, banquet halls 268.94 260.93 252.48 244.85 228.56 222.99 236.02 207.57 201.79 A-3 Assembly, churches 311.88 300.57 292.93 280.91 263.30 254.43 271.60 242.45 233.98 A-3 Assembly, general, community halls, libraries, museums 266.07 254.76 246.12 235.10 216.33 208.46 225.80 195.47 188.01 A-4 Assembly, arenas 306.39 295.08 286.44 275.42 256.37 248.50 266.12 235.51 228.05 B Business 260.69 251.13 241.86 231.65 210.99 202.73 222.56 186.21 177.81 E Educational 273.46 263.96 255.62 245.04 228.69 217.00 236.61 200.36 193.94 F-1 Factory & industrial mod-hazard 160.20 152.78 143.34 138.64 123.55 117.41 132.48 102.44 95.93 F-2 Factory & industrial low-hazard 159.20 151.78 143.34 137.64 123.55 116.41 131.48 102.44 94.93 H-1 High Hazard, explosives 149.46 142.04 133.60 127.90 114.12 106.97 121.74 93.00 N.P.
H-2 H-3 H-4 High Hazard 149.46 142.04 133.60 127.90 114.12 106.97 121.74 93.00 85.50 H-5 HPM 260.69 251.13 241.86 231.65 210.99 202.73 222.56 186.21 177.81 I-2 Institutional, nursing homes 302.01 292.45 283.18 272.97 253.83 N.P. 263.88 229.05 N.P.
I-3 Institutional, restrained 295.86 286.31 277.03 266.83 247.95 238.69 257.74 223.17 212.77 I-4 Institutional, daycare facility 262.22 252.95 244.31 235.67 215.42 209.47 235.71 193.82 187.73 M Mercantile 201.37 193.36 184.91 177.28 161.72 156.15 168.45 140.73 134.95 R-1 Residential, hotels 264.67 255.41 246.77 238.13 218.35 212.40 238.17 196.75 190.67 R-2 Residential, multiple family 221.32 212.06 203.42 194.78 175.96 170.01 194.82 154.36 148.28 R-3 Residential, one/two family 209.61 203.74 198.94 195.12 188.41 181.45 191.77 175.86 165.67 R-4 Residential, care/assisted living facilities 262.22 252.95 244.31 235.67 215.42 209.47 235.71 193.82 187.73 S-1 Storage, moderate hazard 148.46 141.04 131.60 126.90 112.12 105.97 120.74 91.00 84.50 S-2 Storage, low hazard 147.46 140.04 131.60 125.90 112.12 104.97 119.74 91.00 83.50 U Utility, miscellaneous 114.09 107.37 99.89 95.60 85.13 79.54 90.99 67.39 64.19 Partial building permits - use following % of entire project valuation: Foundation only permits use 10% Structural frame only permits use 50% Build-out permits (no TI’s) use 20% For shell only buildings use 80 percent of entire project valuation.
Private Garages use Utility, miscellaneous. Unfinished basements (Group R-3) = $31.5 per sq. ft. N.P. Means not permitted I. Miscellaneous Valuations The following Miscellaneous Valuations table was developed by the San Diego Chapter of ICC and is adjusted annually using the ENR 20 Cities Construction Cost Index, as published by Engineering News-Record, McGraw-Hill Publishing Company.
Structure or Item Valuation Structure or Item Valuation Agricultural Building $59 /sq ft Pile Foundations Aluminum Siding $18 /sq ft Cast-in-place concrete piles $66 /lf Antennas Steel piles $161 /lf Radio over 30 ft high $10,876 ea Retaining Wall Dish, 10 ft diameter Concrete or Masonry $55 /sq ft w/decoder $13,213 ea Re-roofing Awning or Canopy Note: 1 square = 100 square feet (Supported by Building) Built-up Aluminum $65 /sq ft Asphalt based Low Slope $494 /sq Canvas $28 /sq ft Single-Ply $803 /sq Balcony $45 /sq ft Coating $265 /sq Carport $26 /sq ft Fiberglass $442 /sq Commercial Coaches $3,624 ea Overlay $362 /sq Decks (wood) $45 /sq ft Aluminum $1,766 /sq Demolition of Building $8 /sq ft Clay Tile $803 /sq Dwelling Solariums $149 /sq ft Concrete Tile $723 /sq Fence or Freestanding Wall Metal Standing Seam $2,249 /sq Wood or Chain Link $6 /sq ft Roof Structure Replacement $46 /sq ft Wood Frame with Stucco $18 /sq ft Saunas (Steam) $21,060 ea Wire $6 /sq ft Spa or Hot Tub $22,291 ea Masonry $28 /sq ft Stairs (Ramps) $45 /sq ft Wrought Iron $18 /sq ft Stone and Brick Veneer $20 /sq ft Fireplace Storage Racks $3 /cu ft Concrete or masonry $11,214 ea Suspended Ceilings $16 /sq ft Prefabricated metal $7,281 ea Swimming Pool Greenhouse $18 /sq ft Per sq ft of surface area Manufactured Housing $75 /sq ft Vinyl-lined $104 /sq ft Mobile Home $75 /sq ft Gunite $114 /sq ft Patio Fiberglass $124 /sq ft Wood Frame with Cover $28 /sq ft Tenant Improvements $104 /sq ft II.
Alterations to Existing Structures With No Additional Floor Area or Roof Cover Structure or Item Valuation Interior Partition $151 /lf Install Windows or Sliding Glass Doors $46 /sq ft of opening Close Exterior Wall Opening $45 /sq ft of opening To determine building valuation when the scope of work does not add to the existing floor area, for example when enclosing an open porch, or when converting a garage to living space, use the difference in the valuation per square foot between the existing and the new use or occupancy.
Ingested verbatim from the official source for in-app search; confirm against “View official source” for legal use.
| Occupancy Group | IA | IB | IIA | IIB | IIIA | IIIB | IV | VA | VB |
|---|---|---|---|---|---|---|---|---|---|
| A-1 Assembly, theaters w/ stage | 335.89 | 324.58 | 316.94 | 304.93 | 286.87 | 278.00 | 295.62 | 266.02 | 257.55 |
| A-1 Assembly, theaters w/o stage | 307.39 | 296.08 | 288.44 | 276.42 | 258.37 | 249.50 | 267.12 | 237.51 | 229.05 |
| A-2 Assembly, nightclubs | 269.94 | 261.93 | 254.48 | 245.85 | 230.56 | 223.99 | 237.02 | 209.57 | 202.79 |
| A-2 Assembly, restaurants, bars, banquet halls | 268.94 | 260.93 | 252.48 | 244.85 | 228.56 | 222.99 | 236.02 | 207.57 | 201.79 |
| A-3 Assembly, churches | 311.88 | 300.57 | 292.93 | 280.91 | 263.30 | 254.43 | 271.60 | 242.45 | 233.98 |
| A-3 Assembly, general, community halls, libraries, museums | 266.07 | 254.76 | 246.12 | 235.10 | 216.33 | 208.46 | 225.80 | 195.47 | 188.01 |
| A-4 Assembly, arenas | 306.39 | 295.08 | 286.44 | 275.42 | 256.37 | 248.50 | 266.12 | 235.51 | 228.05 |
| B Business | 260.69 | 251.13 | 241.86 | 231.65 | 210.99 | 202.73 | 222.56 | 186.21 | 177.81 |
| E Educational | 273.46 | 263.96 | 255.62 | 245.04 | 228.69 | 217.00 | 236.61 | 200.36 | 193.94 |
| F-1 Factory & industrial mod-hazard | 160.20 | 152.78 | 143.34 | 138.64 | 123.55 | 117.41 | 132.48 | 102.44 | 95.93 |
| F-2 Factory & industrial low-hazard | 159.20 | 151.78 | 143.34 | 137.64 | 123.55 | 116.41 | 131.48 | 102.44 | 94.93 |
| H-1 High Hazard, explosives | 149.46 | 142.04 | 133.60 | 127.90 | 114.12 | 106.97 | 121.74 | 93.00 | N.P. |
| H-2 H-3 H-4 High Hazard | 149.46 | 142.04 | 133.60 | 127.90 | 114.12 | 106.97 | 121.74 | 93.00 | 85.50 |
| H-5 HPM | 260.69 | 251.13 | 241.86 | 231.65 | 210.99 | 202.73 | 222.56 | 186.21 | 177.81 |
| I-2 Institutional, nursing homes | 302.01 | 292.45 | 283.18 | 272.97 | 253.83 | N.P. | 263.88 | 229.05 | N.P. |
| I-3 Institutional, restrained | 295.86 | 286.31 | 277.03 | 266.83 | 247.95 | 238.69 | 257.74 | 223.17 | 212.77 |
| I-4 Institutional, daycare facility | 262.22 | 252.95 | 244.31 | 235.67 | 215.42 | 209.47 | 235.71 | 193.82 | 187.73 |
| M Mercantile | 201.37 | 193.36 | 184.91 | 177.28 | 161.72 | 156.15 | 168.45 | 140.73 | 134.95 |
| R-1 Residential, hotels | 264.67 | 255.41 | 246.77 | 238.13 | 218.35 | 212.40 | 238.17 | 196.75 | 190.67 |
| R-2 Residential, multiple family | 221.32 | 212.06 | 203.42 | 194.78 | 175.96 | 170.01 | 194.82 | 154.36 | 148.28 |
| R-3 Residential, one/two family | 209.61 | 203.74 | 198.94 | 195.12 | 188.41 | 181.45 | 191.77 | 175.86 | 165.67 |
| R-4 Residential, care/assisted living facilities | 262.22 | 252.95 | 244.31 | 235.67 | 215.42 | 209.47 | 235.71 | 193.82 | 187.73 |
| S-1 Storage, moderate hazard | 148.46 | 141.04 | 131.60 | 126.90 | 112.12 | 105.97 | 120.74 | 91.00 | 84.50 |
| S-2 Storage, low hazard | 147.46 | 140.04 | 131.60 | 125.90 | 112.12 | 104.97 | 119.74 | 91.00 | 83.50 |
| U Utility, miscellaneous | 114.09 | 107.37 | 99.89 | 95.60 | 85.13 | 79.54 | 90.99 | 67.39 | 64.19 |
| Structure or Item | Valuation | Structure or Item | Valuation |
|---|---|---|---|
| Agricultural Building | $59 /sq ft | Pile Foundations | |
| Aluminum Siding | $18 /sq ft | Cast-in-place concrete piles | $66 /lf |
| Antennas | Steel piles | $161 /lf | |
| Radio over 30 ft high | $10,876 ea | Retaining Wall | |
| Dish, 10 ft diameter | Concrete or Masonry | $55 /sq ft | |
| w/decoder | $13,213 ea | Re-roofing | |
| Awning or Canopy | Note: 1 square = 100 square feet | ||
| (Supported by Building) | Built-up | ||
| Aluminum | $65 /sq ft | Asphalt based Low Slope | $494 /sq |
| Canvas | $28 /sq ft | Single-Ply | $803 /sq |
| Balcony | $45 /sq ft | Coating | $265 /sq |
| Carport | $26 /sq ft | Fiberglass | $442 /sq |
| Commercial Coaches | $3,624 ea | Overlay | $362 /sq |
| Decks (wood) | $45 /sq ft | Aluminum | $1,766 /sq |
| Demolition of Building | $8 /sq ft | Clay Tile | $803 /sq |
| Dwelling Solariums | $149 /sq ft | Concrete Tile | $723 /sq |
| Fence or Freestanding Wall | Metal Standing Seam | $2,249 /sq | |
| Wood or Chain Link | $6 /sq ft | Roof Structure Replacement | $46 /sq ft |
| Wood Frame with Stucco | $18 /sq ft | Saunas (Steam) | $21,060 ea |
| Wire | $6 /sq ft | Spa or Hot Tub | $22,291 ea |
| Masonry | $28 /sq ft | Stairs (Ramps) | $45 /sq ft |
| Wrought Iron | $18 /sq ft | Stone and Brick Veneer | $20 /sq ft |
| Fireplace | Storage Racks | $3 /cu ft | |
| Concrete or masonry | $11,214 ea | Suspended Ceilings | $16 /sq ft |
| Prefabricated metal | $7,281 ea | Swimming Pool | |
| Greenhouse | $18 /sq ft | Per sq ft of surface area | |
| Manufactured Housing | $75 /sq ft | Vinyl-lined | $104 /sq ft |
| Mobile Home | $75 /sq ft | Gunite | $114 /sq ft |
| Patio | Fiberglass | $124 /sq ft | |
| Wood Frame with Cover | $28 /sq ft | Tenant Improvements | $104 /sq ft |
| Structure or Item | Valuation |
|---|---|
| Interior Partition | $151 /lf |
| Install Windows or Sliding Glass Doors | $46 /sq ft of opening |
| Close Exterior Wall Opening | $45 /sq ft of opening |
Building Code Wizard maintains this record from the official source. Always confirm final determinations with the issuing authority.